Romania – Podisor Natural Gas Pipeline Project

Tuzla – Podisor Natural Gas Pipeline, which will operate with a total operating pressure of 309 kilometers long with a pipe diameter of 48 and 40 inches, will be built by Kalyon Holding. The project also includes 20 valve stations and energy supply, cathodic protection and fiber optic manufacturing. The pipeline is planned to be completed within 24 months after the start of construction activities. The project also envisages the employment of a workforce of about one thousand to one thousand five hundred people.